Strapi 4 → 5 migration
We migrate Strapi 4 projects to Strapi 5 for a fixed price. The upgrade runs on a copy of your project and database, every endpoint your frontend and integrations use is compared before and after, and production is switched over with a backup and the old image ready to restore. A content site takes 2–5 working days, a site with custom logic 1–3 weeks, a project with its own plugins and admin customisation 3–6 weeks. You get the exact price and timeline one business day after we read the repository.
If you plan to do the upgrade in-house, the technical side (breaking changes, commands, codemods) is in our Strapi 5 migration guide. This page is about hiring us to do it.
Why this is on your roadmap now
Strapi 4 stopped receiving bug fixes at the end of October 2025 and security patches at the end of April 2026. The admin panel is a public login form backed by software nobody patches any more, with a frozen dependency tree underneath it. Critical vulnerabilities disclosed in 2026 were fixed in Strapi 5 releases, and only one of them got a backport to v4. The site keeps working, which is exactly why the upgrade keeps slipping.
What the migration includes
- Audit and estimate. We read the repository: Strapi version, plugins and their Strapi 5 status, custom controllers and services, admin customisation, and every consumer of the API (website, mobile app, CRM sync, search index). This is the one-day review that produces the fixed price.
- Staging copy. A clone of the project with production content loaded through
strapi transfer. We use transfer rather than export archives because archives with large media libraries have failed to import for us. - Codemods.
npx @strapi/upgrade majoron the copy, then a review of the diff rather than trusting it blindly. - Manual pass. Everything the codemod marks with
__TODO__, Entity Service calls that took numeric ids, dynamic zone populate queries, admin extensions moved from webpack to Vite, plugins replaced or rewritten. - API diff. Each endpoint called on Strapi 4 and Strapi 5 and the responses compared. You see a table of what changed and what we did about it.
- Frontend. Reads of
data.attributes, id-based links and GraphQL queries updated. If another team owns the frontend, they get the endpoint table and we answer their questions. - Cutover with rollback. Node.js upgraded on the server if needed (Strapi 5 runs on 22, 24 or 26), final content sync, backup taken minutes before the switch, previous image kept. If something goes wrong, the rollback is a database restore and one container swap, rehearsed before the real run.
Timelines by project size
| Project | Typical contents | Duration |
|---|---|---|
| Content site | Content types built in the admin, official plugins, frontend reads REST | 2–5 working days |
| Site with logic | Custom controllers and services, dynamic zones, i18n, two to four community plugins | 1–3 weeks |
| Custom admin | Own plugins, custom admin pages, webpack config, integrations keyed by numeric id | 3–6 weeks |
The spread inside each row comes from three things: how much server code touches ids, how many third-party plugins have no Strapi 5 version, and whether we update the frontend or your team does. One public write-up of a heavily customised project reported about 200 hours, most of it on plugins and admin. A popular 2026 pricing article budgets 8 to 20 hours for a "moderately customised" instance. Both can be true; it is the reason we do not quote before reading the code.
Pricing
Fixed price per project, agreed before work starts. We do not publish a number here because two projects that look alike from the outside (same page count, same frontend) can differ by weeks once you open src/extensions and src/admin. What we can say is how the market prices this work: agencies bill 60 to 150 dollars per hour, freelancers 15 to 50. Our quote lists hours per task, so you can see where the money goes and cut scope if you want to, for example by keeping the compatibility header and moving the frontend later.
The estimate arrives one business day after we get read access to the repository. If the code cannot be shared yet, the admin URL plus a list of installed plugins gives a rough range, and the fixed price follows once we see the code.
How we compare to other migration offers
We looked at what the agencies ranking for this query actually commit to.
| Option | Timeline stated | Price published | After cutover |
|---|---|---|---|
| Sensinum | About one week, "90% automation coverage", zero downtime | No | Not specified |
| TRUETECH | 1–2 weeks | No, on request | 2 weeks of support |
| OpenSpace Services | Depends on custom code, tailored plan | No | Not specified |
| CoreLab | 2–5 days, 1–3 weeks or 3–6 weeks by project size | Fixed price after one-day review, hours per task listed | 2 weeks of log monitoring with fixes included |
Nobody in this market publishes a price, including us. The difference is that you get a fixed number with the hours behind it before signing, not an hourly engagement that ends when it ends.
What we need from you
- Read access to the repository (GitHub, GitLab, Bitbucket, or an archive).
- A recent database dump, or a transfer token to a staging copy.
- The environment variable names from
.env(values can come later). - A list of everything that calls the Strapi API: website, apps, integrations, scheduled jobs.
- Someone on your side who can confirm "yes, this page looks right" during testing.
- For cutover, SSH access to the server or a person who can run the deployment with us.
What you get
- Strapi 5.56 (current as of September 2026) running on your server, on a supported Node.js LTS.
- A list of every changed endpoint with before and after examples.
- A note of each plugin replaced or rewritten, and why.
- Updated deployment files (Dockerfile, compose, Nginx config) if we touched them.
- Two weeks of log monitoring after the switch, with alerts in a shared chat and fixes for anything the migration caused at no extra cost.
When we suggest something else
Sometimes the upgrade is not the cheapest route. If your frontend is already Next.js, most of the project is custom business logic, and editors barely use the Strapi admin, a move to Payload CMS can cost about the same as the Strapi 5 migration and leave you with one codebase. We run production projects on both and will say so in the estimate if that is the case. If the site is content-heavy and editors like the Strapi admin, the upgrade wins.
Time zone and communication
We work in UTC+3. That is a full overlap with European business hours and a morning overlap with the US East Coast. Work happens in a shared chat and your issue tracker, with a short written update at the end of each working day during the migration.
After the migration
Once Strapi 5 is live, new minor releases come out every week or two, and each needs testing on a copy before it reaches production. That is what our support plans cover. If you need more hands on the project itself, see hiring Strapi developers. And if you are also weighing Strapi Cloud against your own server now that you are touching the infrastructure, the numbers are on what Strapi really costs.
Get a fixed price
Send us a repository link, or the admin URL and a list of plugins if the code is not shareable yet. By the next business day you get the price, the timeline, a list of the risky parts (plugins without a v5 version, id-based integrations), and a proposed cutover date. More about the team on the home page.
FAQ
How much does a Strapi 4 to 5 migration cost?
It depends on the custom code, not on the number of pages. A content site with official plugins is a few days of work, a project with its own plugins and a customised admin is several weeks. We give a fixed price after a one-day look at the repository; for reference, agencies in this market bill 60 to 150 dollars per hour.
Will the site go down during the migration?
The work happens on a copy, so production keeps running untouched until cutover. The switch itself is a planned window: final content sync, new image, database migration on first start. We rehearse it on the copy first, so the real window is short and known in advance, and we schedule it when your editors are not publishing.
Do we have to rewrite our frontend?
Eventually yes, because Strapi 5 drops data.attributes and uses documentId. Not necessarily on day one: the Strapi-Response-Format: v4 header and v4CompatibilityMode for GraphQL keep the old response shape while the frontend is moved endpoint by endpoint. We can do the frontend work ourselves or hand your team a list of every changed endpoint.
What if one of our plugins has no Strapi 5 version?
We find out during the one-day review, before you agree to a price. The options are a maintained replacement from the Marketplace, a rewrite on the new Plugin SDK, or moving the logic into a regular controller or service. Each option is priced separately in the estimate.
Can you migrate from Strapi 3?
Yes, but it is a bigger job: Strapi 3 to 4 changed the database structure, so the path goes through a Strapi 4 migration first and then the Strapi 5 upgrade. We scope it after seeing the project and it does not fit the 2–5 day bracket.
What happens after the cutover?
We watch server and application logs for two weeks with alerts going to a shared chat, and fix anything the migration caused at no extra charge. After that you can move to one of our support plans or take the project back in-house with a written summary of what changed.